"...The Marriott Resort Hotel is a "fast track" project. Our design has evolved through concept, schematic, design development and a series of coordination drawings for value engineering purposes. Construction was started without 100% completed construction drawings. Our construction permits were made available to us by submitting phased construction documents with the cooperation of The City of Tucson... Without your website and the seamless manner with which the information is made available to all members of the design and construction team that have access to your site, it would have been much more time consuming and difficult. When one "set" consists of 800 drawings, imagine the storage requirements that would be needed without the electronic files that are readily available for printing or viewing on line. Also, given that hard copies of drawings have to be distributed to team members located from cost to coast, both in Canada and the United States."
Wally Kulka
Director of Construction
Starr Pass Resort Developments LLC
"I believe that one of the best decisions our company made in 2008 was the addition of idtPlans as our main method of transmitting data from one place to another. In the few months that Jim Parker Building Company, Inc. has been a customer of idtPlans, we have already saved the cost of membership and reached out to more sub-contractors and architects than was possible under the old method. The many compliments we have received, not only from our clientele but from those who frequently use other online plan rooms, on the ease of use and navigational flow of the idtPlans site are more than justified. It is a terrific site, that delivers exactly what it promises and always on the cutting edge of technology."
Wanda DeVore
Estimating Department Administrative Assistant
JIM PARKER BUILDING COMPANY, INC.
"idtplans.com has saved US Home significant time and money. Our portal helps us cut an average of two weeks off the bidding process. It also provides incalculable time savings to our subcontractors, who have complimented us on how much easier it is doing business with our company. We expect to save over $10,000 on printing costs alone this year, and that is a conservative estimate."
Edward Craddock
Lennar Corporation